manicwave

Surf the wave

Links for 2008-09-27

Permalink

The planning team is responsible for producing 3 deliverables by the end of the planning iteration:

A list of all prioritized features/stories with estimates A release plan that assigns each feature/story to an iteration/sprint A high-level application architecture, i.e. how the features will likely be implemented

(tags: scrum)